Last night the snow plow clipped the crossing signals on Hill St. in Corunna at the CN tracks.  Today Chris Robins and Darrel Reid were doing the repairs to get it functional again.

2 Comments on Oops

  1. flyfishchris says:

    the signal was hit pretty good, spider arm was broken and luckily had a replacement all assembled at the shop with lights and all, the wires were still intact out of the base which saved alot of work, but the pole was bent from where it was hit and also needed to be replaced, it was alot of work but had the crossing back in service by 6:30 that evening. maintainer Silvio also did alot of the work and parts gathering.
    Chris Robins

  2. admin says:

    Thanks Chris for your input and welcome to St.Clair Railways.